RHT-25K-50KW Commercial Hybrid Three-phase MPPT Inverter

Item No.: RHT-25-50K-Commercial
25-50KW Commercial Three-phase Hybrid Inverter;
4 MPPTs;
Support multi-parallel connection;
Support flexible access of diesel generator;
Compatible with lead-acid and lithium-ion battery;
Support intelligent EMS management function;
Description
Description
RHT 25-50KW Commercial Three-phase MPPT Hybrid Inverter



Product Features:
Talented
98.8% max. efficiency;
100A charge/discharge current;
135-750V super wide battery voltage range
Max. 30A PV input current

Reliable
Up to 100% unbalanced load;
Up to 125% AC output overloading;
Max. 200% back-up output overloading @60s;
Parallel operation capacity support system size from KW to MW level;
IP65 protection degree; 
•Compact and elegant design with integrated diecasting technology; 
•Long-term efficient operation with advanced heat dissipation design; 
•Outstanding working performance thanks to Our MORE platform

Friendly & Flexible
•Convenient installation and O&M with horizontal design and quick plug terminals;
•Easy data check via both OLED display and App;
•Intelligent energy management with built-in EMS;
•Easy Wifi configuration via App;
•Ideal for residential application with low operating noise

Technical Specification:
Specification RHT-25K-100 RHT-30K-100 RHT-36K-100 RHT-40K-100 RHT-50K-100
Max. Input Power (kW) 37.5 45 54 60 75
Start-up Voltage (V) 135 135 135 135 135
Max. DC Input Voltage (V)* 1000 1000 1000 1000 1000
Rated DC Input Voltage (V) 620 620 620 620 620
MPPT Voltage Range (V) 200-950 200-950 200-950 200-950 200-950
No. of MPP Trackers 4 4 4 4 4
No. of DC Inputs per MPPT 2 2 2 2 2
Max. Input Current (A) 30×4 30×4 30×4 30×4 30×4
Max. Short-circuit Current (A) 40×4 40×4 40×4 40×4 40×4
 
Battery Type Lithium Battery (with BMS)
Battery Voltage Range (V) 135-750
Max. Charge/Discharge Current (A) 100/100
 
Rated Output Power (kW) 25 30 36 40 50
Max. Output Apparent Power (kVA) 27.5 33.0/30.0(1) 39.6 44 55
Max. Input Apparent Power (kVA)** 30 36 43.5 48 60
Max. Charging Power of Battery (kW) 25 30 36 40 50
Rated AC Voltage (V) 3L/N/PE; 220/380V; 230/400V; 240/415V
Rated AC Frequency (Hz) 50/60 50/60 50/60 50/60 50/60
Max. Output Current (A) 42 50.0/43.52) 60 66 83
Power Factor 0.8 leading … 0.8 lagging
Max. Total Harmonic Distortion <3% @Rated output power
DCI <0.5%In <0.5%In <0.5%In <0.5%In <0.5%In
Back-up Side
Rated Output Power (kW) 25 30 36 40 50
Max. Output Apparent Power (kVA) 27.5 33 39.6 44 55
Max. Output Current (A) 42 50 60 66 83
UPS Switching Time <20ms <20ms <20ms <20ms <20ms
Rated Output Voltage (V) 3/N/PE; 220/380V; 230/400V; 240/415V
Rated Output Frequency (Hz) 50/60 50/60 50/60 50/60 50/60
Peak Output Apparent Power (kVA)*** 30 36 43.5 48 60
Voltage Harmonic Distortion <3% @Linear load
Efficiency
Max. Efficiency 98.80% 98.80% 98.80% 98.80% 98.80%
European Efficiency 98.30% 98.30% 98.30% 98.30% 98.30%
 Compliance 
IEC/EN 62109, IEC/EN 61000, EN50549-1, TOR Generator Type A, VDE-AR-N-4105
Protection
DC Reverse Polarity Protection Integrated
Battery Input Reverse Connection Protection Integrated
Insulation Resistance Protection Integrated
Surge Protection Integrated
Over-temperature Protection Integrated
Residual Current Protection Integrated
Islanding Protection Integrated (Frequency shift)
AC Over-voltage Protection Integrated
Overload Protection Integrated
AC Short-circuit Protection Integrated
General Data
Over Voltage Category PV: Main:
Dimensions (W×H×D mm) 760×490×290
Weight (KG) 56
Protection Degree IP65
Standby Self-consumption (W) <15
Topology Transformerless
Operating Temperature Range (°C) -30~60
Relative Humidity (%) 0~100
Operating Altitude (m) 3000 (>3000m derating)
Cooling Natural Convection
Noise Level (dB) <50
Display OLED & LED
Communication CAN, RS485, WiFi/LAN (Optional)

* Max. operating DC voltage is 950V, max. withstanding DC voltage is 1000V

** Max apparent power from the grid means the maximum power imported from the utility grid used to satisfy the backup loads and charge the battery

*** The output power will exceed the rated value only when the power in the PV array is sufficient, and the duration of the overload is related to the overload power 1) AS 4777.2: 30.0kVA; 2) AS 4777.2: 43.5A

Send your message to us
please select your country
  • Afghanistan
  • Aland Islands
  • Albania
  • Algeria
  • American Samoa
  • Andorra
  • Angola
  • Anguilla
  • Antigua and Barbuda
  • Argentina
  • Armenia
  • Aruba
  • Australia
  • Austria
  • Azerbaijan
  • Bahamas
  • Bahrain
  • Bangladesh
  • Barbados
  • Belarus
  • Belgium
  • Belize
  • Benin
  • Bermuda
  • Bhutan
  • Bolivia
  • Bosnia and Herzegovina
  • Botswana
  • Bouvet Island
  • Brazil
  • British Indian Ocean Territory
  • British Virgin Islands
  • Brunei Darussalam
  • Bulgaria
  • Burkina Faso
  • Burundi
  • Cambodia
  • Cameroon
  • Canada
  • Cape Verde
  • Caribbean Netherlands
  • Cayman Islands
  • Central African Republic
  • Chad
  • Chile
  • China
  • Christmas Island
  • Cocos Islands
  • Colombia
  • Comoros
  • Congo
  • Cook Islands
  • Costa Rica
  • Cote D'ivoire
  • Cuba
  • Curaçao
  • Cyprus
  • Czech Republic
  • Democratic People's Republic of Korea
  • Democratic Republic of the Congo
  • Denmark
  • Djibouti
  • Dominica
  • East Timor
  • Ecuador
  • Egypt
  • El Salvador
  • Equatorial Guinea
  • Eritrea
  • Estonia
  • Ethiopia
  • Falkland Islands
  • Faroe Islands
  • Fiji
  • Finland
  • France
  • French Guiana
  • French Polynesia
  • French Southern Territories
  • Gabon
  • Gambia
  • Georgia
  • Germany
  • Ghana
  • Gibraltar
  • Greece
  • Greenland
  • Grenada
  • Guadeloupe
  • Guam
  • Guatemala
  • Guernsey
  • Guinea
  • Guinea-Bissau
  • Guyana
  • Haiti
  • Heard Island and Mcdonald Islands
  • Honduras
  • Hong Kong, China
  • Hungary
  • Iceland
  • India
  • Indonesia
  • Iran
  • Iraq
  • Ireland
  • Isle of Man
  • Israel
  • Italy
  • Jamaica
  • Japan
  • Jordan
  • Kazakhstan
  • Kenya
  • Kiribati
  • Korea
  • Kosovo
  • Kuwait
  • Kyrgyzstan
  • Laos
  • Latvia
  • Lebanon
  • Lesotho
  • Liberia
  • Liechtenstein
  • Lithuania
  • Luxembourg
  • Macau, China
  • Macedonia
  • Madagascar
  • Malawi
  • Malaysia
  • Maldives
  • Mali
  • Malta
  • Marshall Islands
  • Martinique
  • Mauritania
  • Mauritius
  • Mayotte
  • Mexico
  • Micronesia
  • Moldova
  • Monaco
  • Mongolia
  • Montenegro
  • Montserrat
  • Morocco
  • Mozambique
  • Myanmar
  • Namibia
  • Nauru
  • Nepal
  • Netherlands
  • Netherlands Antilles
  • New Caledonia
  • New Zealand
  • Nicaragua
  • Niger
  • Nigeria
  • Niue
  • Norfolk Island
  • Northern Mariana Islands
  • Norway
  • Oman
  • Pakistan
  • Palau
  • Palestine
  • Panama
  • Papua New Guinea
  • Paraguay
  • Peru
  • Philippines
  • Pitcairn Islands
  • Poland
  • Portugal
  • Puerto Rico
  • Qatar
  • Reunion
  • Romania
  • Russia
  • Rwanda
  • Saint Barthélemy
  • Saint Helena
  • Saint Kitts and Nevis
  • Saint Lucia
  • Saint Martin
  • Saint Pierre and Miquelon
  • Saint Vincent and the Grenadines
  • San Marino
  • Sao Tome and Principe
  • Saudi Arabia
  • Senegal
  • Serbia
  • Seychelles
  • Sierra Leone
  • Singapore
  • Sint Maarten
  • Slovakia
  • Slovenia
  • Solomon Islands
  • Somalia
  • South Africa
  • South Georgia and The South Sandwich Islands
  • Spain
  • Sri Lanka
  • State of Libya
  • Sudan
  • Suriname
  • Svalbard and Jan Mayen
  • Swaziland
  • Sweden
  • Switzerland
  • Syrian Arab Republic
  • TaiWan, China
  • Tajikistan
  • Tanzania
  • Thailand
  • The Republic of Croatia
  • Togo
  • Tokelau
  • Tonga
  • Trinidad and Tobago
  • Tunisia
  • Turkey
  • Turkmenistan
  • Turks and Caicos Islands
  • Tuvalu
  • Uganda
  • Ukraine
  • United Arab Emirates
  • United Kingdom
  • United States
  • United States Minor Outlying Islands
  • Uruguay
  • US Virgin Islands
  • Uzbekistan
  • Vanuatu
  • Vatican City State
  • Venezuela
  • Vietnam
  • Wallis and Futuna Islands
  • Western Sahara
  • Western Samoa
  • Yemen
  • Zambia
  • Zimbabwe
ver_code
pop_close
pop_main
Newsletter